Skip to content
HVAC Inspection
← All services

HVAC

Done properly.

Know exactly what shape your system's in.

Buying a property, taking over a lease, or just want to understand why your bills are high — our inspections give you a complete picture. Written report included, no pressure to buy anything.

Pricing
From $12,000

Final price set after the visit · pay on completion

Typical duration
1–2 hours

What's included

Everything covered. No hidden extras.

This is what every hvac inspection engagement with us includes — line by line, no surprises on the invoice.

  • Full visual and operational inspection
  • Temperature differential testing
  • Refrigerant pressure check
  • Electrical connection assessment
  • Duct and drainage inspection
  • Efficiency rating estimate
  • Written report with recommendations

How it works

Three simple steps. You always know what's next.

01

Schedule

Book online or call. Inspections typically take 1–2 hours depending on system size.

02

Inspect

We check everything — indoor units, outdoor units, electrical, drainage, ducts, insulation.

03

Report

You get a clear written report within 24 hours: what's good, what's not, and what to prioritize.

Common questions

Before you book.

Before buying or leasing a property, when energy bills spike with no clear cause, after a major weather event, or every 2 years for any commercial system. Pre-purchase inspections often pay for themselves on negotiation alone.

Equipment age and condition, refrigerant pressure readings, temperature differential, electrical safety check, drainage state, ductwork integrity, an efficiency estimate, and a prioritised list of recommendations with rough costing.

No. We perform non-invasive checks. If anything needs to be opened up, we tell you first and get authorisation.

Within 24 hours of the inspection, by email. PDF format suitable for sharing with landlords, buyers, or insurers.

More on the full FAQ.

Talk to a real human.

Ready to book?

Schedule online or call us directly. Free to book — pay the final amount only after the work is done.